The Intervention Compensation System (ICS) is a modular frame which provides four guide wires and a compensated deployment sheave to enable the deployment of umbilicals and tools to the subsea well.

Features

Provides four constant tension guidewires/pod-lines from vessel to seabed
Adjustable line tensions for pod-lines/guidewires
Provides accurate heave compensation for deployment of tools to and from subsea inftrastructure
Rapid mobilisation onto a vessel – typically in less than one day including service hook ups
Multiple configurations possible to suit project needs; several combinations of moonpool and over-the-side possible.
DNV certified structures and cylinders
Up to 6m compensation
Built in protection against shock loading from cable break

This field proven system was designed and built under full DNV survey and classed as an offshore crane.
The ICS comprises two separate H-frames, each with two hydro-pneumatic guide wire tensioning systems, which can be deployed over a vessel’s moonpool or over the side/stern. The 5 m3 air receivers allow the wire tension to be quickly and easily adjusted between 0-6 tonnes. The heave compensation system is installed in one of the frames and can be engaged and disengaged remotely. The system provides heave compensated deployment of subsea and down-hole tooling when teamed with a suitable winch.
Each H-frame can be skidded independently, increasing or decreasing the size of the moonpool opening. This is also beneficial for deepwater applications as the two unitised frames can be mounted at a larger spacing to facilitate separation between umbilicals and wire line activities and reduce the risk of entanglement.
The ICS is designed to be installed onto a work vessel that has a heave compensated crane sufficiently rated to deploy the intervention lubricator and/or other packages. The modular frames have been developed for ease of road transport and shipping, and can be loaded to a vessel with a single lift during mobilisation.

Guide wire units (GW) : 4 x constant tension (API centres)
Stroke : 8 m
Max. GW tension : 6 t
Max. out of service load : 10 t
Min. tension : 1 t
Wire storage capacity : 1,100 m
Wire rope : 19 mm
Maximum heave velocity : 2 m/s
Design water depth : 1000m
Heave compensation system
Type : Passive
Max. capacity : 4,000 kg
Maximum Moonpool size : 7.2 m x 7.2 m
Overall Height: 14.5m (from deck level)
Total Mass: ~110T

Datasheet