Enables connection to be made subsea without the use of divers
Can be designed to suit most API bolted flanges or clamp hubs
Simple hydraulic controls
Deployed on wire by crane or winch
Operated by ROV, or via down line
Optional 2” double block and bleed valves
Field proven
Custom builds available to suit any flange type



